| データシートサーチシステム |
|
EVM-GPS-R4 データシート(PDF) 4 Page - Linx Technologies |
|
|
|||||||||||||||||||||||||||||
EVM-GPS-R4 データシート(HTML) 4 Page - Linx Technologies |
|
4 / 10 page ![]() – – – – 2 3 Ordering Information Ordering Information Part Number Description RXM-GPS-R4-x R4 Series GPS Receiver Module MDEV-GPS-R4 R4 Series GPS Receiver Master Development System EVM-GPS-R4 R4 Series GPS Receiver Evaluation Module x = “T” for Tape and Reel, “B” for Bulk Reels are 1,000 pieces Quantities less than 1,000 pieces are supplied in bulk Figure 2: Ordering Information Figure 4: Figure 3: Electrical Specifications Absolute Maximum Ratings Supply Voltage V CC +4.3 VDC Input Battery Backup Voltage +7.0 VDC Operating Temperature −40 to +85 ºC Storage Temperature −40 to +85 ºC Soldering Temperature +225°C for 10 seconds Exceeding any of the limits of this section may lead to permanent damage to the device. Furthermore, extended operation at these maximum ratings may reduce the life of this device. Absolute Maximum Ratings Figure 3: Absolute Maximum Ratings R4 Series GPS Receiver Specifications Parameter Symbol Min. Typ. Max. Units Notes Power Supply Operating Voltage V CC 3.0 3.3 3.6 VDC Supply Current l CC Peak 122 mA 1 Acquisition 56 mA 1 Tracking 33 mA 1 Hibernate 0.43 mA 1 Backup Battery Voltage V BAT 2.0 6.0 VDC Backup Battery Current I BAT 660 830 µA 2 VOUT Output Voltage V OUT VCC 3 Output Low Voltage V OL 0.4 VDC Electrical Specifications Output High Voltage V OH TX Pin 0.7*VCC VCC VCC VDC 1.8V Level Pin 1.2 1.8 1.85 VDC Output Low Current I OL 2.0 mA Output High Current I OH TX Pin 0.05 mA 1.8V Level Pin 2.0 mA Input Low Voltage V IL –0.4 0.45 VDC Input High Voltage V IH 1.3 3.6 VDC LNA Section Input Power P IN 18 dB Receiver Section Receiver Sensitivity Tracking –160 dBm Navigation –157 dBm Cold Start –145 dBm Acquisition Time Hot Start (Open Sky) 1 s Hot Start (Indoor) 15 s Cold Start 32 s Cold Start, CGEE 15 s Position Accuracy Autonomous 2.5 m SBAS 2.5 m Altitude 18,000 m Velocity 515 m/s Chipset SiRF Star IV, GSD4e ROM Frequency L1 1575.42MHz, C/A Code Channels 48 Update Rate 1Hz default, up to 5Hz Protocol Support NMEA 0183 ver 3.0, SiRF Binary Antenna Port RF Impedance R IN 50 Ω 1. VCC = 3.3V, without active antenna 2. VCC = 0V 3. VOUT current is directly sourced from VCC. |
|
|
リンク URL |
| ALLDATASHEETはお客様のビジネスに役立ちますか? [ DONATE ] |
Alldatasheetは | 広告 | お問い合わせ | プライバシーポリシー | データシートへのリンク | リンク交換 | メーカーリスト All Rights Reserved©Alldatasheet.com |
| Russian : Alldatasheetru.com | Korean : Alldatasheet.co.kr | Spanish : Alldatasheet.es | French : Alldatasheet.fr | Italian : Alldatasheetit.com Portuguese : Alldatasheetpt.com | Polish : Alldatasheet.pl | Vietnamese : Alldatasheet.vn Indian : Alldatasheet.in | Mexican : Alldatasheet.com.mx | British : Alldatasheet.co.uk | New Zealand : Alldatasheet.co.nz |
|
Family Site : ic2ic.com |
icmetro.com |